Critical Notices - Detail
TSP Name:  Colorado Interstate Gas Company, L.L.C.
TSP:  00-691-4865
Notice ID:  8851
Critical:  C
Notice Type Desc:  Maintenance
Notice Stat Desc:  Supersede
Prior Notice:  8849
Notice Eff Date:  03/05/2013
Notice Eff Time:  09:59:55 AM
Reqrd Rsp Desc:  No response required.
Post Date:  03/05/2013
Post Time:  09:59:55 AM

Notice Text

Revision:
Ruby:
Wyoming:
Capacity and firm revised.
7. Roberson Creek Station (Segment B30): Due to a VFD failure one unit will be
 out of service March 6 through March 29 for repair. Capacity through Roberson
 Compressor (RBC) will be reduced from 1,510 MMcf/d to 1,227 MMcf/d. At the
 time of this posting, firm capacity at (RBC) is subscribed at the 1,250 MMcf/d
 level.


                        Cheyenne Plains Gas Pipeline Company
                          Colorado Interstate Gas Company
                               Ruby Pipeline Company
                            Wyoming Interstate Company
                            Young Gas Storage Company

                      Operations Planning Report for March 2013
                             Issued February 15, 2013
                              Reissued March 5, 2013

A calendar and map of maintenance events is available at the following link:
http://ebb.cigco.com/WesternPipes-Notices/CIGCO-Notices/CIG_Maintenance_Impacts-Mar_2013_Updated_3-5-2013.pdf



CHEYENNE PLAINS GAS PIPELINE COMPANY MAINTENANCE

None of the planned maintenance is expected to impact service.

COLORADO INTERSTATE GAS COMPANY MAINTENANCE

Wyoming: None of the planned maintenance is expected to impact service.

Colorado:
1. Trinidad Compressor Station (Segment 230): CIG will perform Annual DOT tests
 and unit shutdown checks March 14. This outage will result in the following
 impacts at Picketwire Constraint (PWC).
                                   *Operational
                            Capacity MMcf/d     Noms MMcf/d
March 14 Cycles 1 thru 3      436 to 348        348
March 14 Cycle 4              436 to 436        407**

* Firm Capacity through (PWC) is subscribed at the 257 MMcf/d level.

** The nomination limit for this cycle has been prorated for the remaining time
 in the gas day.

2. 5B-24"& 5A-22" Wyoming Mainline (Segment 111): CIG will have a section of
 its 5B-24" pipe & 5A-22" pipe out of service for installation of service
 valves for the new Platte Valley Meter Station starting March 5th through
 March 8th one line at a time. Capacity through the Platte Valley (PTV) &
 Platteville (PTT) will be reduced from 73 MMcf/d to 37 MMcf/d & 95 MMcf/d to
 48 MMcf/d.

Firm Capacity through Platte Valley and Platteville are at 3 MMcf/d and 10
 MMcf/d respectively.

Utah: None of the planned maintenance is expected to impact service.

Kansas: None of the planned maintenance is expected to impact service.

South of Springfield, CO (including Texas and Oklahoma): 

3. Morton Compressor Station (Segment 118): Will be out of service March 19 to
 perform annual DOT ESD tests. Capacity through Morton East (MRC) will be
 reduced from 368 MMcf/d to 340 MMcf/d. At the time of this posting, firm
 capacity at (MRC) is subscribed at the 319 MMcf/d level.

4. Mocane Compressor Station (Segment 118): One unit at (MOC) will be out of
 service March 12 through March 13 and March 19 through March 20 for safety
 shutdown checks. Capacity through (MOC) will be reduced from 66 to 46 MMcf/d.
 Firm Capacity through (MOC) is subscribed at the 21 MMcf/d level.


RUBY PIPELINE MAINTENANCE

5. Wieland Flat Compressor Station (Segment B50): One unit will be out of
 service March 5 through March 8 for mechanical inspection. Capacity through
 Ruby West (RWC) will be reduced from 1,510 MMcf/d to 1,368 MMcf/d. At the time
 of this posting, firm capacity at Ruby West (RWC) is subscribed at the 1,050
 MMcf/d level.

7. Roberson Creek Station (Segment B30): Due to a VFD failure one unit will be
 out of service March 6 through March 29 for repair. Capacity through Roberson
 Compressor (RBC) will be reduced from 1,510 MMcf/d to 1,227 MMcf/d. At the
 time of this posting, firm capacity at (RBC) is subscribed at the 1,250 MMcf/d
 level.


WYOMING INTERSTATE COMPANY MAINTENANCE

6. WIC Wamsutter Jumper (Segment W55): WIC will perform repair to Unit exhaust
 March 6 through March 7. This outage results in the following impacts at Three
 Mile Constraint (TMC), Threemile (TML), Threemile REX (TMX) and to Bitter
 Creek (BTC).
                                   *Operational
                           Capacity MMcf/d  Noms MMcf/d
March 6                        299 to 0         0
March 7 Cycle 1 thru 2         299 to 0         0
March 7 Cycle 3 thru 4         299 to 299       199**

For all Cycles March 6 and Cycles 1 and 2 March 7, Deliveries to
 Threemile(TML), Threemile REX(TMX) and to Bitter Creek(BTC) will be taken to
 zero.

* Firm Capacity through (TMC) is fully subscribed at the 299 MMcf/d level.

** The nomination limit for this cycle has been prorated for the remaining time
 in the gas day.

Young Gas Storage Company Maintenance
Unless otherwise noted, Young does not expect the scheduled maintenance
 described below to impact nominated activities, based upon historical system
 demand.


CIG Storage Guidelines

Storage inventory is projected to be within normal guidelines on March 1.

Field          Max Inject., MMcf/d       Max. Withdraw MMcf/d
Boehm                65,000                    124,000
Flank                65,000                    164,000
Ft. Morgan          120,000                    450,000
Latigo               75,000                    139,000
Totals              325,000                    877,000

Note to storage table: Maximum injection and withdrawal figures are based upon
 projections for gas-in-place on March 1, 2013. Departure from these
 projections can affect injection and withdrawal capabilities. Thermal
 quantities were determined based upon an average of 1064 Btu/cf.

March Operations

CIG's Valley Line is typically opened at Campo to provide additional support
 for Valley Line deliveries.

No Planning Meeting Scheduled 

No requests for a Joint Monthly Operating Plan Meeting have been received by
 CP, CIG, Ruby or WIC. Therefore, pursuant to Section 4.11.1 of General Terms
 and Conditions of the CIG FERC Gas Tariff, no such meetings have been
 scheduled. If at anytime there are any questions regarding operational issues,
 do not hesitate to call Dean Makings at (719) 520-4766.

CIG Gas Control compiles this report with assistance from various CIG
 departments.  Any comments or questions about this report should be directed
 to Dean Makings (719) 520-4766 or Bill McMillan (719) 520-4389.